Production & Operations Management + TQM
From transcript: 20ME811 Production & Operations Management (B) · 20BT742 Total Quality Management (A)
Cheat sheet
Formulas
Definitions
- Capacity
- Maximum sustainable output rate
- Bottleneck
- Resource limiting system throughput
- Layout types
- Process, product, cellular, fixed-position
- MPS / MRP
- Master schedule / material requirements planning
- JIT / lean
- Pull, waste elimination, continuous flow
- TQM
- Organization-wide quality culture
- Six Sigma
- DMAIC; defect reduction toward 3.4 DPMO ideal
- Kaizen
- Continuous incremental improvement
- Poka-yoke
- Mistake-proofing
- Value stream
- Map value-adding vs waste steps
- Takt time
- Customer demand pace
- Seven QC tools
- Check sheet, Pareto, histogram, control chart, scatter, fishbone, flowchart
Topic-wise short notes
Capacity, layout, scheduling
- Rough-cut capacity vs CRP detailed.
- Assembly line takt time = available time / demand.
- Project vs job shop vs batch vs mass vs continuous process choice.
- Forecasting: moving average, exponential smoothing, error metrics.
TQM & quality tools
- 7 QC tools: fishbone, Pareto, histogram, control chart, scatter, check sheet, stratification.
- FMEA: severity×occurrence×detection risk priority.
- ISO 9001 process approach & documentation.
- Cost of quality: prevention/appraisal vs failure.
Lean wastes (TIMWOOD)
- Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects (+Skills).
- 5S workplace; SMED setup reduction for smaller batches.
- Pull systems need stable processes — fix quality first.
Exam traps & quick notes
- Fleurette metrics: ~40% labour / ~25% cycle via standards + jigs.
- SmartEco: 35–45% shorter projects via pre-fab standards.
- Six Sigma DMAIC awareness; don't overclaim belt certification.
- Improve bottleneck first (TOC).
- Inventory hides problems — lean exposes them carefully.
- Cp high but Cpk low ⇒ mean off-center — recenter before tightening.
- SPC: distinguish common vs special cause before adjusting.
- Scheduling: FCFS, SPT, EDD — different objectives.
Comprehensive notes
Capacity, layout, scheduling
Process vs product layout; line balancing; MRP vs JIT; Gantt & dispatching rules.
External: MIT OpenCourseWare ops ↗ Lean Enterprise Institute ↗
TQM & quality tools
PDCA, SPC charts, Pareto prioritization, Kaizen events, poka-yoke.
External: ASQ quality tools ↗ iSixSigma DMAIC ↗
Capacity, layout, flow
Process vs product layout; takt; bottleneck (Theory of Constraints lite); MRP vs JIT.
External: NPTEL ↗ Engineering Toolbox ↗
TQM & Six Sigma awareness
PDCA; seven QC tools; DMAIC outline; poka-yoke; standard work. Fleurette and SmartEco metrics as proof of process thinking.
External: NPTEL ↗ Engineering Toolbox ↗
Interview Q&A for this subject
Q: What is takt time?
A: Available time / demand — the customer pace the line must meet.
External: ASQ / quality ↗ MIT OCW ↗